Mfg Part Number: DD101 LONG LEAD
Alternate P/N: DD101LONGLEAD
NSN : 5910-00-678-8157
NIIN : 006788157
CAGE Code : 71590
Manufacturer: Crl Components Inc
Item Name : Capacitor Fixed Ceramic Dielectr
FSC : FSC 5910 Capacitors
If you’re in need of NSN parts, Purchasing Synergy is the ultimate source. As an ASAP Semiconductor company, we have access to a vast and diverse inventory of parts and components like DD101 LONG LEAD for the aerospace, civil aviation, defense, electronics, and industrial markets. This includes parts such as Capacitor Fixed Ceramic Dielectr from Crl Components Inc with Cage Code 71590 as well as part numbers like DD101 LONG LEAD and FSC 5910 Capacitors with006788157. Purchasing Synergy has more than two billion new and obsolete parts readily available with short lead times and competitive prices and, as we are an AS9120B, ISO 9001:2015, and FAA AC 00-56B accredited business, and the only independent distributor with a No China Sourcing Pledge, each part we sell is fully traceable or comes directly from the manufacturer.
Our website offers a range of parametric search capabilities which allow our customers to search for parts through a number like DD101 LONG LEAD and filters, one of which is National Stock Number, or NSN. A National Stock Number is an identifier applied to any item of supply that is repeatedly procured, stocked, stored, issued, and used throughout the federal supply system. Purchasing Synergy has a broad selection of NSN parts such as 5910006788157 from manufacturers like Crl Components Inc. To begin the purchasing process immediately, submit an RFQ today.
NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
---|---|---|---|---|---|---|
5910-00-678-8157 Item Description: Capacitor Fixed Ceramic Dielectr | 5910 | 006788157 | 0 | P | ||
CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
U | A | 0 | ||||
Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
Dd101 Long Lead | 1 | 1 | C | A |
MRC | Criteria | Characteristic |
---|---|---|
AAQL | BODY STYLE | W/O MTG FACILITIES, RADIAL TERMINALS |
AARG | RELIABILITY INDICATOR | NOT ESTABLISHED |
ABJT | TERMINAL LENGTH | 1.500 INCHES MINIMUM |
ABPM | BODY DIAMETER | 0.290 INCHES MAXIMUM |
ADAQ | BODY LENGTH | 0.156 INCHES MAXIMUM |
AEBS | CENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO DIAMETER | 0.250 INCHES NOMINAL |
AEBT | TERMINAL DIAMETER | 0.025 INCHES NOMINAL |
AEBZ | SCHEMATIC DIAGRAM DESIGNATOR | NO COMMON OR GROUNDED ELECTRODE(S) |
AGAV | END ITEM IDENTIFICATION | MISSILE, AI-TO-AIR, PHOEB=NIX (AIM-54); TELETYPE, MODEL 28; TEST CONSOLES, MINI-SACE; ENGINE, AIRCRAFT TF33-PW-102 (C-135E, EC-135H/K/P); MISSILE, AIR-TO-AIR, SPARROW (AIM-7); SUPPORT EQUIPMENT, MX PEACEKEEPER MISSILE; SUPPORT EQUIPMENT, B- |
CQBQ | CAPACITANCE VALUE PER SECTION | 100.000 PICOFARADS SINGLE SECTION |
CQFB | VOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE | -56.0/+22.0 WITHOUT VOLTAGE APPLIED SINGLE SECTION |
CQJJ | NONDERATED OPERATING TEMP | -55.0 DEG CELSIUS MINIMUM AND 85.0 DEG CELSIUS MAXIMUM |
CQWM | NONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION | 1000.0 DC SINGLE SECTION |
CRTL | CRITICALITY CODE JUSTIFICATION | FEAT |
CRTP | TOLERANCE RANGE PER SECTION | -10.00/+10.00 PERCENT SINGLE SECTION |
CWJK | CASE MATERIAL | PLASTIC |
CWPK | INSULATION RESISTANCE AT REFERENCE TEMP | 10000.0 MEGOHMS |
CWSG | TERMINAL SURFACE TREATMENT | SOLDER |
FEAT | SPECIAL FEATURES | WEAPON SYSTEM ESSENTIAL |
TTQY | TERMINAL TYPE AND QUANTITY | 2 UNINSULATED WIRE LEAD |
“We Proudly Support Intrepid Fallen Heroes Fund that serves United States Military Personal experiencing the Invisible Wounds of War : Traumatic Brain Injury (TBI) and Post Traumatic Stress (PTS). Please visit website (www.fallenheroesfund.org) and help in their valiant effort”. |
We Hope that You Will Visit Us Again the Next Time You Need NSN Parts and Make Us Your Strategic Purchasing Partner.
Request for Quote